CONSTRUCTION INFORMATION
On April 14th the Malcolm-Knox Aquatic Centre began phase 1 of construction. The new pool is scheduled to be completed by the spring 2010. It will house a 10 lane 50m pool with new dive towers, a mezzanine for spectators, offices and a multipurpose room.
The second phase of construction will start immediately after the completion of the new pool. Our original 50 m pool will become a brand new stainless steel Myrtha pool. The depth will start at 1.1 m and increase to 1.4 m at the deeper end.
We thank you for your patience and look forward to the completion of this long awaited project.
You can follow construction progress below. Click on the picture to enlarge.
Construction began on April 14, 2009
|
Fencing went up around the construction zone. The main entrance is relocated between the Aquatic Centre and Arena
|
|

|

|
|
April 30th - The original main entrance is torn down. The entrance was cut away from the main building and pulled to the ground.
|
| |
 |
 |
 |
|
|
By May 1st, Clean up of the old lobby is complete.
|
|
|
Throughout the month of May.
|
|

|
Excavation of the site begins while pilings are continuously being driven into the ground.
|

|
|


The pilings are driven 60 feet down before they are anchored to bedrock to provide a solid support for the weight of the building's steel structure.
|
|
July through September 2009
|
|

|
The foundation of the building takes shape.
|

|
|
|

|
|
 |
The concrete walls of the new pool have been poured.
|

|
 |
The steel structure of the new building progresses.
|
 |
|
During the months of March and April, 2010
|
|

|
The dive towers are taking shape.
|

|
|

|

|

|
| |
|
|
 |
|
 |
 |
The offices and mezzanine are ready to be painted.
|
 |
 |
The future entrance and our bright multi-purpose room.
|
 |
| |
|
|
|